Positions · EU dossier

Industrial Accelerator Act

The proposed Industrial Accelerator Act includes, among others, low-carbon and EU-origin requirements for aluminium and steel in public procurement and support schemes. On this page: procedure stage, upcoming dates, acts from the Law register and the full state of play.

← Positions and consultations

Reviewed 21.10.2026 · next review by 20.11.2026

  • EU
  • Climate and energy
  • Smelting
  • Processing
  • Product manufacturers

At a glance

Proposal COM(2026) 100 – work in Parliament and Council; EP committee vote planned for 01.12.2026.

  • COM(2026) 100Commission proposal of 04.03.2026; legal basis: Art. 114 and 207(2) TFEUEUR-Lex, procedure 2026/0068(COD)
  • 01.12.2026planned vote in EP committees (INTA, ITRE, IMCO); no Council general approachEP, draft report PE792.067
  • 25%at least this share of low-carbon aluminium of EU origin in procurement and support schemes – the only non-ferrous metal in Annex IICOM(2026) 100, Annex II
  • 01.01.2029proposed application of Annex II requirements (aluminium, steel)COM(2026) 100

Procedure stage and dates

  • 2026/0068(COD)Parliament and Council · since 04.03.2026

Stages: 1. Announced2. Consultation3. Proposal4. Parliament and Council5. Trilogues6. Adoption and publication7. Application8. Review

Upcoming dates

  1. planned vote in EP committees (INTA, ITRE, IMCO)Industrial Accelerator Act (IAA) – proposal
  2. start of application; repeal of Regulation (EU) 2019/452Foreign investment screening – new Regulation 2026/1386
  3. proposed application of the Annex II requirements (aluminium, steel)Industrial Accelerator Act (IAA) – proposal

Chamber position

No documents have been published on this dossier.

Dossier documents and sources in the Library →

Acts in the Law register

EU policy

Industrial Accelerator Act – state of play

Proposal COM(2026) 100 of 4 March 2026 combines low-carbon and Union-origin requirements in public procurement, faster permitting and conditions for large foreign investments. Aluminium is the only non-ferrous metal covered by the requirements. Procedure, content and dates – based solely on official documents.

Commission proposal in the legislative procedureRegulation · Arts 114 and 207(2) TFEU

Parliament and Council are preparing their positions – before trilogues

In the European Parliament the proposal is handled jointly by the INTA, ITRE and IMCO committees; the draft report was presented on 11 September 2026 and the committee vote is scheduled for 1 December 2026. The Competitiveness Council discussed the proposal on 28 May and 24 September 2026; no general approach has been adopted yet. The EESC (15.07.2026) and the Committee of the Regions (14.10.2026) have delivered opinions.

Aluminium from 2029

25%

minimum share of low-carbon aluminium of Union origin in procurement and support schemes (Annex II of the proposal)

As of 21.10.2026

Procedure: from announcement to application

Diagram 1. Procedure: proposal COM(2026) 100, procedure 2026/0068(COD)

Diagram 1. Procedure: proposal COM(2026) 100, procedure 2026/0068(COD)Upper track, completed: Commission work programme 11.02.2025, Clean Industrial Deal 26.02.2025, consultations 15.04–09.07.2025, Regulatory Scrutiny Board opinions 26.09 and 20.11.2025, proposal 04.03.2026, EESC opinion 15.07.2026 and CoR opinion 14.10.2026. Lower track, ongoing: European Parliament (INTA, ITRE, IMCO) and Council of the EU in parallel, then trilogues, adoption and publication, application.Preparation of the proposal and advisory opinions – completed
Commission work programmeCOM(2025) 45, Annex I item 1111.02.2025
Clean Industrial DealCOM(2025) 8526.02.2025
ConsultationsHYS 14505: 295 and 315 replies15.04–09.07.2025
Regulatory scrutinynegative, then positive with reservations26.09 · 20.11.2025
Commission proposalCOM(2026) 10004.03.2026
EESC and CoR opinionsINT/1119 · CDR-0993-202615.07 · 14.10.2026
Legislative procedure 2026/0068(COD) – ongoingnow – in parallel
European ParliamentINTA, ITRE, IMCO committees; draft report 11.09.2026committee vote 01.12.2026 (scheduled)
Council of the EUpolicy debate 28.05.2026, progress 24.09.2026no general approach (as of 21.10.2026)
Triloguesonce Parliament and Council have set their positions
Adoption and publicationin force the day after publication in the OJ (Art. 36)date not known
ApplicationArts 4–5 one year after entry into force; Annex II from 01.01.2029as proposed
In the Commission work programme 2025 the initiative was called the Industrial Decarbonisation Accelerator Act. Publication was postponed several times; the Regulatory Scrutiny Board first issued a negative opinion. 428 pieces of feedback on the proposal were submitted on Have Your Say (until 18.06.2026).

What the proposal introduces

Diagram 2. Lead markets, permitting and foreign investment in proposal COM(2026) 100

Diagram 2. Lead markets, permitting and foreign investment in proposal COM(2026) 100Minimum shares from 01.01.2029: low-carbon steel at least 25%, low-carbon aluminium of Union origin at least 25%, low-carbon concrete and mortar of Union origin at least 5%. Cost derogations at 25% and 30% and a 7-month delay. Permitting: single access point, 45 days for completeness, acceleration areas including NACE C24. Foreign investment above EUR 100 million: 4 of 6 conditions, including 50% EU workers.Lead markets – Annex II, from 01.01.2029
Steel – low-carbon
≥ 25%
Aluminium – low-carbon, EU origin
≥ 25%
Concrete and mortar – low-carbon, EU origin
≥ 5%
Derogationsprocurement: cost more than 25% higher (Art. 11(3)); support schemes: cost more than 30% higher or a delay of over 7 months (Art. 12(3))requirements cover support schemes accounting for at least 45% of the national budget for such schemes (Art. 12(1))
Union originunder the Union Customs Code (Art. 7); in procurement, content from countries with a free trade agreement, customs union or GPA parties also counts as Union origin (Art. 8), in support schemes – without GPA (Art. 9)
Permitting and foreign investment
Permitting – Chapters II and Vsingle access point and single application; completeness acknowledged within 45 days (Arts 4–5); NZIA permitting rules apply to energy-intensive industry decarbonisation projects (Art. 6). At least one acceleration area per Member State within 12 months (Art. 25), including for basic metals – NACE C24 (Annex I); aggregated baseline permit for each area (Art. 27)Arts 4–5 apply one year after entry into force (Art. 36)
Foreign investment – Chapter IVabove EUR 100 million where the investor’s country holds over 40% of global manufacturing capacity; batteries, electric vehicles, solar PV and extraction, processing and recycling of critical raw materials (Art. 17). Approval requires at least 4 of 6 conditions, with at least 50% EU workers mandatory (Art. 18)exemption to the extent of commitments under EU free trade agreements (Art. 17(3))
Annex II covers products for buildings, infrastructure and vehicles: in procurement procedures launched from 01.01.2029 and in support schemes established or updated from that date. Low-carbon status will be defined by delegated acts under Regulations (EU) 2024/3110 and 2024/1781 (Art. 10(1)). Source: COM(2026) 100, Arts 4–27, Annexes I–II. Content as proposed by the Commission – may change during the procedure.

Timeline

Diagram 3. Timeline 2025–2029

Diagram 3. Timeline 2025–2029Chart: announcement 26.02.2025; consultations 15.04–09.07.2025; Regulatory Scrutiny Board opinions 26.09 and 20.11.2025; proposal 04.03.2026; EP rapporteurs 29.04.2026; Competitiveness Council 28.05 and 24.09.2026; feedback closes 18.06.2026; EESC 15.07.2026; EP draft report 11.09.2026; Polish Sejm 06.10.2026; CoR 14.10.2026; EP committee vote scheduled 01.12.2026; Annex II requirements from 01.01.2029.20252026202720282029
Announced in the Clean Industrial Deal
26.02.2025
Consultations (HYS 14505)
15.04.2025–09.07.2025
Regulatory Scrutiny Board: two opinions
26.09 · 20.11.2025
Commission proposal COM(2026) 100
04.03.2026
EP: INTA, ITRE, IMCO rapporteurs appointed
29.04.2026
Competitiveness Council: debate and progress
28.05 · 24.09.2026
Feedback on the proposal closes (428)
18.06.2026
EESC opinion INT/1119
15.07.2026
EP: draft committee report
11.09.2026
Polish Sejm: EU Affairs Committee – draft position
06.10.2026
Committee of the Regions opinion CDR-0993-2026
14.10.2026
EP: committee vote (scheduled)
01.12.2026
Annex II requirements in procurement and support schemes
01.01.2029today
The EP committee vote and the indicative plenary date (14.12.2026) are taken from the OEIL procedure file – to be confirmed. The date 01.01.2029 is set in the proposal; deadlines counted from entry into force (e.g. acceleration areas – 12 months) depend on the publication date. The “today” line moves automatically.

Relevance for non-ferrous metals

Aluminium – lead market

Aluminium is the only non-ferrous metal with binding requirements: at least 25% low-carbon aluminium of Union origin in products for buildings, infrastructure and vehicles bought through public procurement or supported with public money (Annex II). For steel the proposal requires only low-carbon content, with no origin criterion.

Low-carbon definition and label

The low-carbon threshold is not set in the proposal – it will be defined by delegated acts under the Construction Products Regulation (2024/3110) and the Ecodesign Regulation (2024/1781). The Commission may also establish voluntary emission-intensity classes for products of ETS activities, based on ETS and CBAM data and taking into account incentives for recycled materials (Art. 10).

Copper, zinc, lead

The proposal does not name these metals and sets no demand-side requirements for them. General provisions may apply: acceleration areas covering basic metals (NACE C24), procedures for energy-intensive industry decarbonisation projects (Art. 6) and – in the critical raw materials sector, which includes copper – conditions for large foreign investments (Art. 17).

Recycled content and scrap

The explanatory memorandum states that emission-intensity thresholds should take account of recycled content – the threshold decreasing as recycled content rises; for steel it foresees an adjustment by scrap share. In designing the emission classes the Commission is to consider the need to incentivise recycled materials in all production routes (Art. 10(2)).

Acceleration areas

Each Member State is to designate at least one area within 12 months of entry into force, prioritising industrial and brownfield sites outside Natura 2000 (Art. 25). An aggregated baseline permit is issued for each area (Art. 27). The Commission refers to tacit approval at intermediate stages and a maximum of 18 months for specific projects (Commission questions and answers).

Links to other acts

The proposal amends the Single Digital Gateway (2018/1724), NZIA (2024/1735) and Construction Products (2024/3110) Regulations. Acceleration areas are to cooperate within the Critical Raw Materials Board and use CRMA joint purchasing (Art. 26). The emissions label builds on ETS and CBAM data. The Commission estimates that demand measures will add over EUR 600 million in value in steel, aluminium and cement by 2030 (Commission questions and answers).

Next steps

European Parliament

Rapporteurs: Anna Cavazzini (Greens/EFA), Christophe Grudler (Renew), Pierre Jouvet (S&D). The draft report (PE792.067) of 11.09.2026 proposes, among other things, raising thresholds to 50% by 2036 and covering plastics; ENVI committee opinion – 07.10.2026. The committee vote is scheduled for 01.12.2026.

Council of the EU

After the ministerial debate (28.05.2026) and the progress report (24.09.2026) the proposal is being discussed in the working party; no general approach has been adopted so far. Trilogues can start once both institutions have set their positions.

Implementing and delegated acts

After adoption: national investment authorities within 1 month, an implementing act on verifying foreign investment conditions within 6 months (Art. 18), the method for calculating the Union-origin share (Art. 16(3)) and delegated acts on emission classes (Art. 10(2)).

Poland

The Sejm’s EU Affairs Committee examined the proposal together with the draft Polish position on 06.10.2026 (sitting no. 163; presented by the Secretary of State at the Ministry of Development and Technology, rapporteur Andrzej Grzyb MP); 15.09.2026 – government information ahead of the Competitiveness Council.

Key facts

Act
Proposal for a Regulation of the European Parliament and of the Council establishing a framework of measures for the acceleration of industrial capacity and decarbonisation in strategic sectors and amending Regulations (EU) 2018/1724, (EU) 2024/1735 and (EU) 2024/3110
Document
COM(2026) 100 final, 04.03.2026; SEC(2026) 70, SWD(2026) 70–72
Procedure
2026/0068(COD); EP: joint INTA, ITRE, IMCO committees, ENVI opinion
Legal basis
Arts 114 and 207(2) TFEU
Objective
manufacturing at least 20% of EU GDP by 2035 (Art. 2); 14.3% in 2024
As of
21.10.2026

Information note based on official documents of the EU and the Polish Sejm; not a legal interpretation. It describes the Commission proposal – the final text of the Regulation depends on the outcome of the legislative procedure.

Change log

  1. Dossier page: procedure stage, upcoming dates and acts from the Law register.
  2. State-of-play analysis: proposal COM(2026) 100, Annex II requirements (aluminium, steel), work in Parliament and Council, EESC and CoR opinions.

Subscribe to dossier updates (RSS)

Contact on this dossier: biuro@igmnir.pl

Get access to the Chamber’s analyses