Positions · EU dossier

Critical Raw Materials Act

The Critical Raw Materials Act sets EU 2030 benchmarks for extraction, processing and recycling of strategic raw materials – including copper and aluminium. On this page: stage of the Regulation and its amendment, upcoming dates, acts from the Law register and the full implementation analysis.

← Positions and consultations

Reviewed 24.10.2026 · next review by 23.11.2026

  • EU
  • Raw materials
  • Mining
  • Smelting
  • Recycling

At a glance

Regulation 2024/1252 applies; amendment COM(2025) 946 – EP–Council negotiations after the EP vote of 20.10.2026.

  • 10 / 40 / 25%EU 2030 benchmarks: extraction, processing and recycling of annual consumption of strategic raw materialsReg. (EU) 2024/1252, Art. 5
  • ≤ 65%maximum share of a single third country in the supply of each strategic raw materialReg. (EU) 2024/1252, Art. 5
  • 106strategic projects recognised by the Commission (25.03.2025, 04.06.2025, 09.10.2026)European Commission, C(2026) 8051
  • 17 / 34strategic / critical raw materials; copper and aluminium strategic, zinc, lead and tin not listedReg. (EU) 2024/1252, Annexes I and II

Procedure stage and dates

  • 2024/1252Application · since 23.05.2024
  • 2025/0385(COD)Trilogues · since 20.10.2026

Stages: 1. Announced2. Consultation3. Proposal4. Parliament and Council5. Trilogues6. Adoption and publication7. Application8. Review

Upcoming dates

  1. deadline for the study on the recovery of critical raw materials from extractive waste (Art. 27(3))Critical Raw Materials Act (CRMA)
  2. earliest date for the publication of information on recycled content in permanent magnets (Art. 29(1))Critical Raw Materials Act (CRMA)
  3. application of Arts 40 and 41 (Art. 49(2)); deadline for the Commission’s evaluation of the regulation (Art. 48(1))Critical Raw Materials Act (CRMA)

Chamber position

No documents have been published on this dossier.

Dossier documents and sources in the Library →

Acts in the Law register

EU policy

Critical Raw Materials Act – implementation

Regulation (EU) 2024/1252 on critical raw materials has been in force since 23 May 2024. Copper and aluminium are strategic raw materials under it. Implementation, the amendment, deadlines and strategic projects – based solely on official documents.

In force since 23.05.2024Amendment in procedureRegulation (EU) 2024/1252 · Art. 114 TFEU

The Regulation is in force – implementation and amendment under way

The Commission has recognised 106 strategic projects in total (25.03.2025, 04.06.2025 and 09.10.2026). On 3 December 2025 it presented the RESourceEU plan and amending proposal COM(2025) 946; the Council adopted its position on 4 March 2026, and on 20 October 2026 the European Parliament adopted its amendments and referred the file for interinstitutional negotiations.

Strategic projects

106

47 in the EU + 13 outside + 46 in the EU; 6 involving Poland

As of 24.10.2026

Procedure: Regulation and amendment

Diagram 1. Procedure: Regulation 2024/1252 and amendment COM(2025) 946

Diagram 1. Procedure: Regulation 2024/1252 and amendment COM(2025) 946Upper track: the Regulation – proposal 16.03.2023, agreement 13.11.2023, EP vote 12.12.2023, Council adoption 18.03.2024, signature 11.04.2024 and publication 03.05.2024, entry into force 23.05.2024. Lower track: the amendment – proposal 03.12.2025, Council position 04.03.2026, Parliament’s amendments 20.10.2026, trilogues (current stage), adoption.Regulation (EU) 2024/1252 – completed
Commission proposalCOM(2023) 16016.03.2023
EP–Council agreementoutcome of trilogues13.11.2023
EP plenary vote549 for, 43 against, 24 abstentions12.12.2023
Council adoptionlast step of the procedure18.03.2024
Signature and publicationsigned 11.04.2024 · OJ L 2024/125203.05.2024
Entry into force20 days after publication23.05.2024
Amendment COM(2025) 946 – ongoing
Commission proposalCOM(2025) 946, together with the RESourceEU plan03.12.2025
Council of the EUnegotiating position04.03.2026
European ParliamentEP amendments (T10-0343/2026), referral for negotiations20.10.2026
now
TriloguesEP and Council with mandatesfrom 20.10.2026
Adoption and publicationdate not known
The amendment provides, among other things, for the Commission to identify large companies using strategic raw materials (Art. 24), a wider scope for permanent magnet labelling (Art. 28) and pre-consumer waste counting towards recycled content in magnets.

2030 benchmarks and raw material lists

Diagram 2. 2030 benchmarks and raw material lists

Diagram 2. 2030 benchmarks and raw material lists2030 benchmarks as a share of the EU’s annual consumption of strategic raw materials: extraction at least 10%, processing at least 40%, recycling at least 25%, a single third country at most 65%. List of 17 strategic raw materials including copper, aluminium and nickel (battery grade); 34 critical raw materials; zinc, lead and tin not listed.2030 benchmarks – Art. 5(1)
Extraction in the EU
≥ 10%
Processing in the EU
≥ 40%
Recycling in the EU
≥ 25%
Share of a single third country
≤ 65%
Non-ferrous metals in the listscopper and bauxite / alumina / aluminium – strategic and critical; nickel – battery grade; zinc, lead and tin – in neither listlists reviewed by 24.05.2027, then every 3 years (Art. 3(3), Art. 4(3))
17 strategic raw materials – Annex I
bauxite / alumina / aluminiumbismuthboron (metallurgy)cobaltcoppergalliumgermaniumlithium (battery)magnesium metalmanganese (battery)graphite (battery)nickel (battery)platinum group metalsrare earths for magnetssilicon metaltitanium metaltungsten
34 critical raw materials – Annex IIinclude all strategic raw materials (Art. 4(2)) and, among others, antimony, arsenic, baryte, beryllium, fluorspar, hafnium, niobium, tantalum and vanadium
Benchmarks refer to the EU’s annual consumption of strategic raw materials; the extraction benchmark applies “to the extent possible in light of the Union’s reserves”. Delegated recycling benchmarks for waste streams – by 1.01.2027 (Art. 5(3)). Source: Regulation (EU) 2024/1252, Art. 5, Annexes I and II.

Implementation timeline

Diagram 3. Implementation timeline 2024–2030

Diagram 3. Implementation timeline 2024–2030Chart: entry into force 23.05.2024; first call 23.05–22.08.2024; 47 EU projects 25.03.2025; 13 outside the EU 04.06.2025; second call 25.09.2025–15.01.2026; 46 projects 09.10.2026; RESourceEU and amendment 03.12.2025; national exploration programme – deadline 24.05.2025, Poland 02.09.2026; national circularity programmes by 16.06.2028; list review 24.05.2027; evaluation 24.05.2029; 2030 benchmarks.2024202520262027202820292030
Entry into force; 1st meeting of the Critical Raw Materials Board
23.05.2024
First call for strategic projects
23.05.2024–22.08.2024
47 strategic projects in the EU (13 States, incl. Poland)
25.03.2025
13 strategic projects outside the EU
04.06.2025
Second call for strategic projects
25.09.2025–15.01.2026
46 projects in 16 States (incl. Poland)
09.10.2026
RESourceEU and amending proposal COM(2025) 946
03.12.2025
National exploration programme (Art. 19): deadline and Polish government resolution
24.05.2025PL 02.09.2026
National circularity programmes (Art. 26) after Impl. Reg. 2026/1116
16.06.2026–16.06.2028
Review of raw material lists (Arts 3–4), then every 3 years
24.05.2027
Evaluation of the Regulation (Art. 48)
24.05.2029
2030 benchmarks (Art. 5)
2030today
Dates take account of the corrigendum (OJ L 2024/90330 of 03.06.2024), which among other things moved the evaluation of the Regulation to 24.05.2029. Circularity programmes are due 2 years after Implementing Regulation (EU) 2026/1116 entered into force (16.06.2026). The “today” line moves automatically.

Relevance for non-ferrous metals

Recycling and waste streams

Implementing Regulation (EU) 2026/1116 of 26.05.2026 lists waste streams with critical raw material recovery potential, including construction and demolition waste – aluminium, aluminium alloys, copper, copper alloys and cables – and aluminium components and wiring harnesses from vehicles. Member States adopt national circularity programmes by 16.06.2028 (Art. 26).

Scrap – RESourceEU announcements

The RESourceEU plan (COM(2025) 945, 03.12.2025) announces that by Q2 2026 the Commission will propose targeted measures for aluminium scrap and export restrictions on permanent magnet scrap; similar measures for copper scrap are to be considered after further monitoring. The Commission also aims to close loopholes for copper and aluminium scrap declared as products.

Strategic projects involving Poland

2025: POLVOLT (Elemental Battery Metals, recycling – incl. Ni, Cu, Co), the Puławy rare earths separation plant (Mkango Resources). 2026: Retków-Grodziszcze deposit (KGHM Polska Miedź, copper extraction), Integrated Recycling Smelter (KGHM, copper and nickel recycling), Urban mining (TDM Electronics, recycling) and CRM4Defence (Leonardo, recycling in Italy, Poland, the UK and France).

Implementation in Poland

On 2.09.2026 the Council of Ministers launched the national critical raw materials exploration programme (Art. 19; EU deadline: 24.05.2025), run by PIG-PIB until 2033. Draft Act on ensuring the national economy’s access to raw materials, including critical raw materials (UC83, Ministry of Climate and Environment) – planned government adoption: Q3 2026. Poland is represented on the Critical Raw Materials Board by the Ministry’s Department of Geology.

Obligations of large companies

By 24.05.2025 Member States were to identify large companies manufacturing, among others, batteries, permanent magnets and other products using strategic raw materials; these carry out a supply-chain risk assessment at least every 3 years (Art. 24). The amendment moves identification of these companies to the Commission.

Permanent magnets

Products with permanent magnets will be labelled (Art. 28 – implementing act on the label due 24.11.2025 per the corrigendum), and those placing them on the market will disclose the share of recovered materials in magnets – from 24.05.2027 or 2 years after the delegated act, whichever is later (Art. 29).

Next steps

Amendment COM(2025) 946

Parliament adopted its amendments on 20.10.2026 (T10-0343/2026) and referred the file back to ITRE for interinstitutional negotiations; the next stage is trilogues with the Council, which adopted its position on 04.03.2026.

Aluminium scrap – trade measure

Initiative 16192: call for evidence 19.12.2025–31.01.2026 (142 responses); Commission adoption planned for Q4 2026.

Critical Raw Materials Centre

Legislative initiative in the Commission work programme 2026 (Q2 2026, Art. 114 TFEU). Consultation 19.05–29.07.2026 (138 responses); according to the European Parliament (20.09.2026) no proposal has yet been tabled.

Next call for projects

The Commission announced the next call for strategic projects towards the end of 2026 (press release of 09.10.2026). By 24.05.2027 – review of the strategic and critical raw material lists.

Key facts

Act
Regulation (EU) 2024/1252 of the European Parliament and of the Council of 11.04.2024 establishing a framework for ensuring a secure and sustainable supply of critical raw materials
Publication
OJ L 2024/1252, 03.05.2024; in force 23.05.2024
Corrigendum
OJ L 2024/90330, 03.06.2024 – incl. dates in Arts 27, 28, 31, 44 and 47 (24.11.2025) and 48–49 (24.05.2029)
Lists
17 strategic (Annex I), 34 critical (Annex II)
Amendment
COM(2025) 946, procedure 2025/0385(COD)
As of
24.10.2026

Information note based on official documents of the EU and the Polish government; not a legal interpretation. The binding text is the Regulation as published in the Official Journal of the EU, together with the corrigendum.

Change log

  1. Dates from the Law register aligned with the corrigendum: application of Arts 40 and 41 and the evaluation (Art. 48) – 24.05.2029; the 24.11.2026 deadline concerns Art. 27(3) only.
  2. Dossier page: procedure stage, upcoming dates and acts from the Law register.
  3. Implementation analysis: 2030 benchmarks, raw material lists, 106 strategic projects, amendment COM(2025) 946.

Subscribe to dossier updates (RSS)

Contact on this dossier: biuro@igmnir.pl

Get access to the Chamber’s analyses